IntrinsicIntrinsic
← Scroll for more →

Recent Updates — CNL

November 3, 2026View Source ↗

Collective Mining Ltd. announced assay results for drill hole APC174-D4 at the Ramp Zone of its Apollo deposit in Colombia, intersecting 154.30 meters grading 12.66 grams per tonne gold equivalent (AuEq), including a high-grade core of 30.45 meters at 39.01 g/t AuEq. The intercept is the broadest high-grade zone drilled to date at the site and returned grades locally over 75% higher than current Mineral Resource estimates, extending the mineralization envelope both shallower and deeper. Drilling concluded in sulphide-rich breccia outside the existing resource model, suggesting a potential new mineralized chute that will be targeted by upcoming deep-drilling rigs. The company is also advancing construction on a planned 3-kilometer underground exploration adit to facilitate future drilling operations at depth.

Collective Mining Ltd. operates as an exploration-stage gold and silver mining company focused on the Guayabales Project in Colombia.

October 27, 2026View Source ↗

Collective Mining Ltd. announced assay results from thirty diamond drill holes at its Guayabales Project in Colombia, targeting the Apollo deposit's Shallow Halo Zone (SHZ). Key intercepts include 14.25 meters grading 6.49 g/t AuEq and a high-grade core of 3.60 meters grading 18.83 g/t AuEq from Pad43. The results indicate widespread mineralization outside the current Mineral Resource, with 44 of 47 SHZ holes since September exceeding the 0.30 g/t cut-off grade. The company remains fully funded for its 2026 drilling program with US$93.7 million in cash and 13 active rigs. Collective Mining is a gold, silver, copper and tungsten exploration company operating projects in Colombia.

October 22, 2026View Source ↗

Collective Mining Ltd. filed an independent technical report supporting the maiden Mineral Resource estimate for its Apollo deposit at the Guayabales Project in Caldas, Colombia. The report, effective October 13, 2026, confirms a maiden Mineral Resource of 2.58 million ounces AuEq Indicated (37.0 Mt at 2.17 g/t AuEq) and 2.83 million ounces AuEq Inferred (48.2 Mt at 1.83 g/t AuEq). The deposit hosts gold, silver, copper, and tungsten mineralization. Collective Mining Ltd. is a gold, silver, copper and tungsten exploration company with projects in Caldas, Colombia.

October 22, 2026View Source ↗

Collective Mining Ltd. filed a NI 43-101 technical report documenting the first mineral resource estimate for the Apollo deposit at its Guayabales Project in Colombia, effective August 31, 2026. The maiden estimate comprises 85.2 million tonnes of combined Indicated and Inferred resources grading 2.17 g/t AuEq and 1.83 g/t AuEq respectively. Total contained metal is estimated at 5.41 million ounces of gold equivalent (AuEq). The resource includes 37.0 Mt of Indicated material and 48.2 Mt of Inferred material, with no Measured resources or Mineral Reserves reported. Metallurgical testwork indicates high recoveries for gold, silver, copper, and tungsten using conventional gravity, flotation, and cyanidation processes. The Qualified Persons recommend an advanced exploration program of approximately 125,000 metres of drilling to expand the resource and upgrade classifications ahead of a Preliminary Economic Assessment expected in 2028. Collective Mining Ltd. is an exploration-stage mining company focused on mineral projects in Colombia.

October 20, 2026View Source ↗

Collective Mining announced assay results from four diamond drill holes at its Guayabales Project in Colombia, intersecting significant gold-silver-copper mineralization. Two new holes stepped out approximately 340 meters along the untested northwestern margin of the Ramp Zone, with intercepts including 54.00 m @ 2.84 g/t AuEq and 12.10 m @ 11.33 g/t AuEq. The company also identified new high-grade veins in previously undrilled ground outside the breccia body. Assays are pending for 95 additional holes, including 19 from the Ramp Zone, as the fully funded program continues with 13 active rigs.

October 13, 2026View Source ↗

Collective Mining Ltd. announced assay results from seventeen diamond drill holes targeting the Shallow Halo Zone of its Apollo Deposit at the Guayabales Project in Colombia. The company identified a new high-grade silver-tungsten discovery in hole APC-186, which returned 5.50 meters grading 1,283 g/t silver and 0.83% WO3 within an 87.60-meter interval averaging 158 g/t AgEq. Additionally, broad shallow mineralization was intersected across the zone, including 149.55 meters at 50 g/t AgEq from surface in hole APC-193. Twenty-two of twenty-three Shallow Halo Zone holes reported since September have returned intervals above the open pit cut-off grade, with only 29% of the zone tested and three rigs dedicated to evaluating the remaining potential. The company remains fully funded for its 2026 drilling program with US$93.7 million in cash and plans to begin construction on an exploration adit in Q4 2026. Collective Mining Ltd. is a gold, silver, copper and tungsten exploration company operating projects in Caldas, Colombia.